What to decide before demolition, what happens at rough-in and trim-out, and what moves the plumbing cost, drawn from the bathroom remodels our crew plumbed in Mukilteo, Edmonds and Everett this year
The plumbing in a bathroom remodel happens in two visits: rough-in while the walls and floor are open, and trim-out after the tile and vanity are in. Decide the layout, the fixtures and your finish measurements before demolition, and bring the plumber in early. Most remodel surprises are plumbing that was planned too late.
1. Decide What Moves Before Anything Is Demolished
The plumbing cost of a remodel is set less by the size of the room than by how much moves. Keeping the toilet, the vanity and the shower where they are is the simplest job; moving a shower across the room, converting a tub to a shower or adding a freestanding tub means new drains and vents under the floor.
In central Mukilteo last year, the homeowners took the biggest version of that step: the old tub became a walk-in shower, and the old shower’s space became a laundry station. That meant converting the tub drain to a shower drain, setting a new pan, adding a new pressure-balancing valve and running water and a drain for the laundry. It was planned, and the permit pulled, before the crew started.
2. Choose the Fixtures Early, Especially the Tub
Rough-in is built around specific fixtures. A shower valve has a required depth in the wall, a freestanding tub has its own drain location, and a floor-mounted filler has to come up through the floor in exactly the right place.
On a Harbour Pointe master bath in September, Logan and Willie finished every other drain, then carried the new freestanding tub upstairs and marked its drain and valve from the tub itself. That only works when the tub is on site at rough-in. When a fixture arrives late, the rough-in waits for it, or the plumber returns for another visit.
3. Give the Plumber Your Finish Measurements
Tile, backer board and new flooring all change where a valve or a drain has to sit. On the Harbour Pointe job, the homeowner’s numbers set everything: finished floor an inch above the subfloor, tub and shower surrounds an inch off the framing, and a three-inch gap beside the vanity. Without those numbers, valve trim ends up too deep or too shallow for the tile.
4. Expect the Permit and the Inspection
Moving or adding plumbing takes a plumbing permit from the city, or from the county outside city limits, and an inspection before the walls close. On a south Edmonds bathroom remodel in August, the new tub was set, its drain tested with five gallons of water, the valve built to the homeowner’s measurements, and then the tub was filled for the inspector.
5. Plan for What the Walls Reveal
Opening a wall in an older house can show drains that were undersized or built wrong by an earlier remodel. In north Edmonds in January, Connor and Logan found a kitchen and bathroom waste system put together wrong and rebuilt both stacks before setting new fixtures. Leave room in the plan, and the budget, for the plumbing behind the wall to need work.
6. Replace the Small Parts While You Can Reach Them
Angle stops, the main shutoff and old supply lines are cheap to replace while the walls are open and expensive to reach afterward. On the central Mukilteo remodel, five tired stops were replaced, and the old gate-valve main shutoff was swapped for a ball valve through an opening in a closet below.
7. Trim-Out Is One Day of Careful Testing
When the finishes are in, the fixtures go in: valve trim, shower system, faucets and drains, the toilet. On a View Ridge-Madison master bath in Everett this summer, Willie and Logan set new stops, the toilet, a shower system and two lav faucets in one day, and tested every piece before it was sealed. Our Everett master bath trim-out story walks through that day.
Bathroom Remodel Plumbing Questions
What makes bathroom remodel plumbing cost more?
Moving things. Relocating a shower or toilet, converting a tub to a shower, adding a freestanding tub or moving a laundry means new drains and vents under the floor, which takes days, not hours. Keeping fixtures where they are, replacing like for like, costs far less. Wall surprises and late fixtures also add visits.
Should I buy the fixtures before the plumber comes?
Yes, at least the tub and the shower valve. Rough-in is built around them: valve depth, drain location and a freestanding tub’s filler all depend on the exact model. In Harbour Pointe, the tub was carried upstairs at rough-in so its drain could be marked from it. Faucets and the toilet can wait until trim-out.
Can I keep living in the house during a bathroom remodel?
Usually, if there is another bathroom. The water is shut off for parts of the rough-in days, but most of the time the rest of the house works. A full repipe is different: on one Everett house our crew repiped before its bathroom remodel, the water was off for two days.
Our Recommendation
Bring a licensed plumber in before demolition, not after. Settle what moves, have the tub and valve on site for rough-in, and give your finish measurements in writing. Replace the stops and the main shutoff while the walls are open. Those four decisions prevent most of the return visits we see on remodels.